The contract works comprised fabrication and installation of 6 nos.
precast RC caissons each weight of 1,550ton, excavation and filling work of 1.93million cu.m, construction of bank revetment of about 2,000m, 4-cells RC box culvert of 1,390m, cooling water intake channel of 900m and relevant dredging works, construction of cross-channel bridge of 147m in length, supply and installation of silt screen at entrance of the channel etc.