Dredging And Reclamation Archives - CHINA CHANGSHENG GROUP LIMITED https://www.chinahkcs.com/en/portfolio-types/en-dredging-and-reclamation/ CHANGSHENG GROUP Wed, 08 Nov 2023 06:15:02 +0000 en-GB hourly 1 http:///wp-content/plugins/matomo/app/index.php?idSite=1&module=CoreHome&action=index&period=day&date=yesterday#?period=day&date=yesterday&category=Dashboard_Dashboard&subcategory=1 https://www.chinahkcs.com/wp-content/uploads/2023/10/favicon.ico Dredging And Reclamation Archives - CHINA CHANGSHENG GROUP LIMITED https://www.chinahkcs.com/en/portfolio-types/en-dredging-and-reclamation/ 32 32 Hong Kong-Zhuhai-Macao Bridge – Zhuhai-Macao Port https://www.chinahkcs.com/en/portfolio-item/hong-kong-zhuhai-macao-bridge-zhuhai-macao-port/ https://www.chinahkcs.com/en/portfolio-item/hong-kong-zhuhai-macao-bridge-zhuhai-macao-port/#respond Sun, 05 Nov 2023 04:23:52 +0000 https://www.chinahkcs.com/?post_type=portfolio&p=551 The 35.6km-long Hong Kong-Zhuhai-Macao Bridge (HZMB), which crossing though Pearl River Estuary, is a world class cross-sea marine link linking Hong Kong, Zhuhai and Macao. The […]

The post Hong Kong-Zhuhai-Macao Bridge – Zhuhai-Macao Port appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
The 35.6km-long Hong Kong-Zhuhai-Macao Bridge (HZMB), which crossing though Pearl River Estuary, is a world class cross-sea marine link linking Hong Kong, Zhuhai and Macao. The company undertook the construction of the part of the seawall of Southern Section of Zhuhai-Macao Port Artificial Island Reclamation. The works included dredging and rock filling.

The post Hong Kong-Zhuhai-Macao Bridge – Zhuhai-Macao Port appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
https://www.chinahkcs.com/en/portfolio-item/hong-kong-zhuhai-macao-bridge-zhuhai-macao-port/feed/ 0
Shenzhen Airport Extension – Site Formation – Seawall Works, Reclamation and Ground Treatment, Shenzhen, PRC https://www.chinahkcs.com/en/portfolio-item/shenzhen-airport-extension-site-formation-seawall-works-reclamation-and-ground-treatment-shenzhen-prc/ https://www.chinahkcs.com/en/portfolio-item/shenzhen-airport-extension-site-formation-seawall-works-reclamation-and-ground-treatment-shenzhen-prc/#respond Sat, 04 Nov 2023 04:22:21 +0000 https://www.chinahkcs.com/?post_type=portfolio&p=552 Seawall Construction: The works include dredging and rockfilling for construction of over 10km sloping seawalls. A special method – underwater explosive compaction was used to eliminate […]

The post Shenzhen Airport Extension – Site Formation – Seawall Works, Reclamation and Ground Treatment, Shenzhen, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>

Seawall Construction:

The works include dredging and rockfilling for construction of over 10km sloping seawalls.

A special method – underwater explosive compaction was used to eliminate the water pollution and to decrease the quantity of dredging and disposal of marine mud.

Reclamation and Ground Treatment:
By using sand tube, a 6km temporary seawall was constructed for reclamation. About 50,000sq.m. land was formed by using hydraulic filling method.
The band drains (PVD) of total 3.66 million liner meter was installed.

Pilot Test Zone:
About 44,000sq.m. land was filled by using hydraulic filling method after relevant works including sand blanket, rock fill for temporary embankment, geotextile laying completed.
Various ground treatment measures such as band drain, vibroflotation, dynamic compaction and surcharge on the ground etc. had been carried out to obtain useful information for whole project. More than 50 nos. of engineering vessels such as derrick lighters, split hopper barges and 20 nos. of earth work plant, 6 sets of vibroflotation plant and 10 sets of band drain installation plant were deployed for the project.

The post Shenzhen Airport Extension – Site Formation – Seawall Works, Reclamation and Ground Treatment, Shenzhen, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
https://www.chinahkcs.com/en/portfolio-item/shenzhen-airport-extension-site-formation-seawall-works-reclamation-and-ground-treatment-shenzhen-prc/feed/ 0
Regulation of Shenzhen RiverPhaseIII – Dredging Work, Shenzhen, PRC https://www.chinahkcs.com/en/portfolio-item/regulation-of-shenzhen-riverphaseiii-dredging-work-shenzhen-prc/ https://www.chinahkcs.com/en/portfolio-item/regulation-of-shenzhen-riverphaseiii-dredging-work-shenzhen-prc/#respond Fri, 03 Nov 2023 03:58:21 +0000 https://www.chinahkcs.com/?post_type=portfolio&p=553 This was a joint venture project between Hong Kong and Shenzhen Governments, total amounting to some 2 billion HK Dollars and lasted over 10 years.The company […]

The post Regulation of Shenzhen RiverPhaseIII – Dredging Work, Shenzhen, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
This was a joint venture project between Hong Kong and Shenzhen Governments, total amounting to some 2 billion HK Dollars and lasted over 10 years.
The company involved in this project and removed more than 50,000cu.m contaminated mud from the river bed.

The post Regulation of Shenzhen RiverPhaseIII – Dredging Work, Shenzhen, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
https://www.chinahkcs.com/en/portfolio-item/regulation-of-shenzhen-riverphaseiii-dredging-work-shenzhen-prc/feed/ 0
The Grand Canal – Shandong Jining Section – Dredging Work, Jining, PRC https://www.chinahkcs.com/en/portfolio-item/the-grand-canal-shandong-jining-section-dredging-work-jining-prc/ https://www.chinahkcs.com/en/portfolio-item/the-grand-canal-shandong-jining-section-dredging-work-jining-prc/#respond Thu, 02 Nov 2023 03:56:05 +0000 https://www.chinahkcs.com/?post_type=portfolio&p=554 The company has undertaken the dredging works of about 3,000,000 cu.m of soil for regulation and widening of the Grand Canal at Shandong Jining Section.The regulated […]

The post The Grand Canal – Shandong Jining Section – Dredging Work, Jining, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
The company has undertaken the dredging works of about 3,000,000 cu.m of soil for regulation and widening of the Grand Canal at Shandong Jining Section.
The regulated canal is about 14.5km in length.
Over 30 vessels including grab dredgers, cutter suction dredgers, digger dredgers and other supporting vessels of various types have been deployed for the project.

The post The Grand Canal – Shandong Jining Section – Dredging Work, Jining, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
https://www.chinahkcs.com/en/portfolio-item/the-grand-canal-shandong-jining-section-dredging-work-jining-prc/feed/ 0
Hainan Maritime Safety Administration – Qing Lan Base, Hai Kou, PRC https://www.chinahkcs.com/en/portfolio-item/hainan-maritime-safety-administration-qing-lan-base-hai-kou-prc/ https://www.chinahkcs.com/en/portfolio-item/hainan-maritime-safety-administration-qing-lan-base-hai-kou-prc/#respond Wed, 01 Nov 2023 04:54:26 +0000 https://www.chinahkcs.com/?post_type=portfolio&p=556 The project comprised the construction of the jetty and approach bridge, reclamation and ground treatment, construction of the embankment to reclamation area, dredging of the basin, […]

The post Hainan Maritime Safety Administration – Qing Lan Base, Hai Kou, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
The project comprised the construction of the jetty and approach bridge, reclamation and ground treatment, construction of the embankment to reclamation area, dredging of the basin, roads/stockyards and drainage work, water works and fire fighting work, E&M work, buildings and virescence work etc.

The post Hainan Maritime Safety Administration – Qing Lan Base, Hai Kou, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
https://www.chinahkcs.com/en/portfolio-item/hainan-maritime-safety-administration-qing-lan-base-hai-kou-prc/feed/ 0
Tianjin Binhai Tourism Area – Linhai New Town Reclamation Phase I, Tianjin, PRC https://www.chinahkcs.com/en/portfolio-item/tianjin-binhai-tourism-area-linhai-new-town-reclamation-phase-i-tianjin-prc/ https://www.chinahkcs.com/en/portfolio-item/tianjin-binhai-tourism-area-linhai-new-town-reclamation-phase-i-tianjin-prc/#respond Mon, 30 Oct 2023 02:40:07 +0000 https://www.chinahkcs.com/?post_type=portfolio&p=557 The contract comprised construction of embankment of approximately 9.1km long, hydraulic filling work of 17.43million cu.m, reclamation of 432 hectares of land and ground improvement work […]

The post Tianjin Binhai Tourism Area – Linhai New Town Reclamation Phase I, Tianjin, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
The contract comprised construction of embankment of approximately 9.1km long, hydraulic filling work of 17.43million cu.m, reclamation of 432 hectares of land and ground improvement work of 4.26million sq.m.
There were 7 nos. of cutter suction dredgers and more than 10 nos. of supporting vessels used for filling work.
More than 50 sets of band drain installation plant and hundreds of sets of special equipment including vacuum preloading equipment etc. were deployed for ground improvement work.

The post Tianjin Binhai Tourism Area – Linhai New Town Reclamation Phase I, Tianjin, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
https://www.chinahkcs.com/en/portfolio-item/tianjin-binhai-tourism-area-linhai-new-town-reclamation-phase-i-tianjin-prc/feed/ 0
CSSC Longxue Shipbuilding & Ship Repairing Base, Guangzhou, PRC https://www.chinahkcs.com/en/portfolio-item/cssc-longxue-shipbuilding-ship-repairing-base-guangzhou-prc/ https://www.chinahkcs.com/en/portfolio-item/cssc-longxue-shipbuilding-ship-repairing-base-guangzhou-prc/#respond Sun, 29 Oct 2023 02:53:00 +0000 https://www.chinahkcs.com/?post_type=portfolio&p=618 The contract comprised dredging works for berthing zone of the wharves, turning basin and harbour basin (sub-channel) at Civil Product Zone.Total 6,820,000cu.m soils including 370,000cu.m hard […]

The post CSSC Longxue Shipbuilding & Ship Repairing Base, Guangzhou, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
The contract comprised dredging works for berthing zone of the wharves, turning basin and harbour basin (sub-channel) at Civil Product Zone.
Total 6,820,000cu.m soils including 370,000cu.m hard clay (Grade 5), 800,000cu.m MDG (Grade 15) and 20,000cu.m pell-mell rocks were dredged and disposed within 9 months construction period.
Over 40 vessels including dredgers and other supporting vessels of various types were deployed for the project.

The post CSSC Longxue Shipbuilding & Ship Repairing Base, Guangzhou, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
https://www.chinahkcs.com/en/portfolio-item/cssc-longxue-shipbuilding-ship-repairing-base-guangzhou-prc/feed/ 0