Other Archives - CHINA CHANGSHENG GROUP LIMITED https://www.chinahkcs.com/en/portfolio-types/en-other/ CHANGSHENG GROUP Wed, 08 Nov 2023 05:16:48 +0000 en-GB hourly 1 http:///wp-content/plugins/matomo/app/index.php?idSite=1&module=CoreHome&action=index&period=day&date=yesterday#?period=day&date=yesterday&category=Dashboard_Dashboard&subcategory=1 https://www.chinahkcs.com/wp-content/uploads/2023/10/favicon.ico Other Archives - CHINA CHANGSHENG GROUP LIMITED https://www.chinahkcs.com/en/portfolio-types/en-other/ 32 32 F1 Motor Boat World Championship Grand Prix – Racing Pool, Shenzhen, PRC https://www.chinahkcs.com/en/portfolio-item/f1-motor-boat-world-championship-grand-prix-racing-pool-shenzhen-prc/ https://www.chinahkcs.com/en/portfolio-item/f1-motor-boat-world-championship-grand-prix-racing-pool-shenzhen-prc/#respond Sun, 05 Nov 2023 06:39:00 +0000 https://www.chinahkcs.com/?post_type=portfolio&p=619 Over 100 vessels including cutter suction dredgers, grab dredgers, hopper barges as well as excavators, dump trucks were deployed for dredging, excavating and disposal of soils, […]

The post F1 Motor Boat World Championship Grand Prix – Racing Pool, Shenzhen, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
Over 100 vessels including cutter suction dredgers, grab dredgers, hopper barges as well as excavators, dump trucks were deployed for dredging, excavating and disposal of soils, dewatering and refill of water in excavated racing pool.

Total 3.5million cu.m of marine mud was dredged and over 2.2million cu.m of water was dewatered and refilled within 4months period which would be taken 16 months to finish in normal operation.

The FMOF F1 Organizing Committee surprised “It is unbelievable. Shenzhen has completed an impossible work”.

The post F1 Motor Boat World Championship Grand Prix – Racing Pool, Shenzhen, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
https://www.chinahkcs.com/en/portfolio-item/f1-motor-boat-world-championship-grand-prix-racing-pool-shenzhen-prc/feed/ 0
Nan Ao Bridge – Temporary Works, Nan Ao, PRC https://www.chinahkcs.com/en/portfolio-item/nan-ao-bridge-temporary-works-nan-ao-prc/ https://www.chinahkcs.com/en/portfolio-item/nan-ao-bridge-temporary-works-nan-ao-prc/#respond Sun, 05 Nov 2023 05:39:00 +0000 https://www.chinahkcs.com/?post_type=portfolio&p=616 The natural environment of the construction area of the Nan Ao Bridge is extremely harsh with the strong wind and big waves.The workable construction period is […]

The post Nan Ao Bridge – Temporary Works, Nan Ao, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
The natural environment of the construction area of the Nan Ao Bridge is extremely harsh with the strong wind and big waves.
The workable construction period is very short throughout the year. The company gave full play to its own advantages in vessels and plants and undertook the construction

The post Nan Ao Bridge – Temporary Works, Nan Ao, PRC appeared first on CHINA CHANGSHENG GROUP LIMITED.

]]>
https://www.chinahkcs.com/en/portfolio-item/nan-ao-bridge-temporary-works-nan-ao-prc/feed/ 0